CONTENTdm
Skip to content home : browse : advanced search : preferences : my favorites : about : help   
CONTENTdm Collection
 
Search results for Martin > Martin Stern jr., A. I. A. Architect and Associates   
Refine your search
Type of Site (AAT)
Resorts (597)
Business Districts (3)
Housing Developments (1)
Retail Stores (1)
Convention Centers (1)
Show more...

Original Date
1985 (151)
1968-08-05 (58)
1964-08-03 (36)
1971-12-01 (31)
1985-11-22 (30)
Show more...

results 1-20 of 603 item(s)  page 1 of 31 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Type of Site (AAT): Description:

1. Proposal for the Xanadu Hotel and Casino (Las Vegas), October 30, 1975 Proposal for the Xanadu Hotel and Casino (Las Vegas), October 30, 1975 resorts Binder containing the proposal for the Xanadu resort, including conceptual sketches, pictures of mockups, and detailed proposal documents. Unbuilt project. Page 75 of proposal is missing. Stamped or labeled...

2. Photograph of a rendering of Harrah's Tahoe (Stateline, Nev.), circa 1972 Photograph of a rendering of Harrah's Tahoe (Stateline, Nev.), circa 1972 resorts; Stern's revised concept of the Harrah's Tahoe. Transcribed from photo: "Harrah's Lake Tahoe. Martin Stern Jr., A.I.A. Architect & Associates." Artist's name on rendering: Sigfried Knop. Transcribed from...

3. Architectural drawing of Riviera Hotel tower addition (Las Vegas), first floor plan, mezzanine plan, Architectural drawing of Riviera Hotel tower addition (Las Vegas), first floor plan, mezzanine plan, December 12, 1973 resorts; First floor and mezzanine plans for additions and alterations to the tower of the Riviera Hotel from 1974. Drawn by FD and BH. Includes revision dates, notes, and key plan. Printed on mylar. John T. Iwamoto,...

4. Architectural drawing of Riviera Hotel tower addition (Las Vegas), partial typical room plan and room Architectural drawing of Riviera Hotel tower addition (Las Vegas), partial typical room plan and room elevations, December 12, 1973 resorts; Partial typical room plan and room elevations for additions and alterations to the tower of the Riviera Hotel from 1974. Also drawn by B.K. Includes revision dates. Printed on mylar. John T. Iwamoto, delineator;...

5. Showboat Hotel and Casino (Atlantic City), finish schedule, first floor, mezzanine and second floor, Showboat Hotel and Casino (Atlantic City), finish schedule, first floor, mezzanine and second floor, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

6. Showboat Hotel and Casino (Atlantic City), door schedule, November 22, 1985 Showboat Hotel and Casino (Atlantic City), door schedule, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. 'Drawn by ME.' John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical...

7. Showboat Hotel and Casino (Atlantic City), finish schedule (additional), November 22, 1985 Showboat Hotel and Casino (Atlantic City), finish schedule (additional), November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

8. Showboat Hotel and Casino (Atlantic City), parking building, finish schedule, November 22, 1985 Showboat Hotel and Casino (Atlantic City), parking building, finish schedule, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

9. Showboat Hotel and Casino (Atlantic City), door schedule, November 22, 1985 Showboat Hotel and Casino (Atlantic City), door schedule, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. 'Drawn by ME.' John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical...

10. Showboat Hotel and Casino (Atlantic City), finish schedule, first floor, October 3, 1985 Showboat Hotel and Casino (Atlantic City), finish schedule, first floor, October 3, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

11. Showboat Hotel and Casino (Atlantic City), finish schedule, fourth and fifth floor, November 22, 1985 Showboat Hotel and Casino (Atlantic City), finish schedule, fourth and fifth floor, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

12. Showboat Hotel and Casino (Atlantic City), finish schedule, second floor, November 22, 1985 Showboat Hotel and Casino (Atlantic City), finish schedule, second floor, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

13. Showboat Hotel and Casino (Atlantic City), finish schedule, fourth floor, April 15, 1985 Showboat Hotel and Casino (Atlantic City), finish schedule, fourth floor, April 15, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

14. Showboat Hotel and Casino (Atlantic City), finish schedule, basement and first floor, November 22, 1985 Showboat Hotel and Casino (Atlantic City), finish schedule, basement and first floor, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

15. Showboat Hotel and Casino (Atlantic City), finish schedule, third floor, November 22, 1985 Showboat Hotel and Casino (Atlantic City), finish schedule, third floor, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

16. Showboat Hotel and Casino (Atlantic City), door schedule, November 22, 1985 Showboat Hotel and Casino (Atlantic City), door schedule, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. 'Drawn by ME.' John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical...

17. Showboat Hotel and Casino (Atlantic City), finish schedule, second floor, November 22, 1985 Showboat Hotel and Casino (Atlantic City), finish schedule, second floor, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

18. Showboat Hotel and Casino (Atlantic City), door schedule, November 22, 1985 Showboat Hotel and Casino (Atlantic City), door schedule, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. 'Drawn by ME.' John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical...

19. Showboat Hotel and Casino (Atlantic City), finish schedule, first floor, November 22, 1985 Showboat Hotel and Casino (Atlantic City), finish schedule, first floor, November 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.

20. Showboat Hotel and Casino (Atlantic City), finish schedule, second floor and third floor, July 22, 1985 Showboat Hotel and Casino (Atlantic City), finish schedule, second floor and third floor, July 22, 1985 resorts; Plans for the construction of the Showboat Hotel Casino in Atlantic City from 1985. John A. Martin, structural engineer; Albert A. Hellman, mechanical engineer; Norman A. Cohen, electrical engineer.
select all : clear all : add to favorites
results 1-20 of 603 item(s)  page 1 of 31 : ( <<  1  2  3  4  5  6  7  8  9  10  >> ) :: previous : next
powered by CONTENTdm ® | contact us  ^ to top ^