1. Himix Concrete Plant at Hoover Dam site
|

2. First concrete in Hoover Dam
|

3. View of the concrete lining in the diversion tunnels
|

4. Concrete form construction work
|

5. Invert concrete pouring forms inside diversion tunnel
|

6. Concrete lining inside diversion tunnel no. 2
|

7. Concrete pouring forms below a cofferdam in the Hoover Dam construction site
|

8. Close-up of Hoover Dam concrete pouring construction taken from the Arizona side, looking downstream
|

9. Looking downstream over the top of Hoover Dam
|

10. Commemoration of the pouring of the second millionth cubic yard of concrete in Hoover Dam
|

11. Final pour in the slot, Hoover Dam
|

12. Diversion tunnel no. 2, showing the pumpcrete line to the upstream plug
|

13. First 40 foot slab of concrete poured in lining diversion tunnels
|

14. Pouring concrete -- Hoover Dam
|

15. Hoover Dam -- Cement work
|

16. Trucks hauling concrete in the diversion tunnel
|

17. Union Pacific Streamline train at the dam site
|

18. Gantry crane inside diversion tunnel no. 3
|

19. Side-wall jumbo inside diversion tunnel
|

20. Section of a concrete-pouring jumbo standing outside of a diversion tunnel
|

21. Trains on Elevation 720 Railroad Bench, hauling conrete to Hoover Dam.
|

22. Construction on Hoover Dam, looking downstream on the Colorado River
|

23. Excavation for bridge abutment in Arizona spillway.
|

24. Nevada power house at Hoover Dam construction site
|

25. Downsteam view of Hoover Dam, showing power house construction
|

26. View of power houses being constructed at the Hoover Dam site
|

27. Power house under construction at Hoover Dam site
|

28. Construction workers on the drum gates in the Arizona spillway
|

29. Top of Hoover Dam, during construction
|

30. Top of Hoover Dam, during construction
|

31. View of bridge across Hoover Dam during construction
|

32. Hoover Dam construction, looking down on top
|

33. Intake towers during construction of Hoover Dam
|

34. Construction at Hoover Dam, inside a tunnel
|

35. Construction of the Arizona power house
|

36. Central section of the powerhouse
|

37. View of no. 1 plug showing the arch and raise
|

38. Looking upstream at Hoover Dam during construction
|

39. Steel rails on the roof of the Nevada valve house awaiting concrete pouring
|

40. Construction on the Arizona power house
|

41. Construction on the power houses viewed from the valve house catwalk
|

42. Looking upstream toward the Nevada intake towers, showing the intake bridge girders in place.
|

43. Construction on the Arizona power house
|

44. Construction on crest of Hoover Dam
|

45. No. 5 intake tower finished to elevation 1232, showing curtain wall
|

46. Agitators dumping concrete into buckets
|

47. Telephoto view of Arizona powerhouse units
|

48. Looking across the downstream face of Hoover Dam, showing the utility towers and elevator shaft
|

49. Cement work -- Hoover Dam
|

50. Construction of Hoover Dam diversion tunnel
|