Search for exactly "Construction equipment", all of "Construction Equipment"

Grid | List | Tile

Object thumbnail
1. Hoover Dam construction equipment
Object thumbnail
2. Crew operating construction equipment at Hoover Dam site
Object thumbnail
3. Hoover Dam construction equipment
Object thumbnail
4. Construction equipment -- Hoover Dam
Object thumbnail
5. Men operating heavy equipment at Hoover Dam site.
Object thumbnail
6. Lewis Construction Company drilling railroad tunnels of U.S. Construction Railroad to Hoover Dam.
Object thumbnail
7. Hoover Dam site, looking upstream
Object thumbnail
8. Penstock tunnel piping
Object thumbnail
9. Trash rack structure being installed in front of diversion tunnel no. 2
Object thumbnail
10. Construction near the upper portals of diversion tunnels no. 1 and no. 2
Object thumbnail
11. Electric shovel loading rocks into dump truck
Object thumbnail
12. Worker sitting in dump truck being loaded by power shovel
Object thumbnail
13. Dump truck unloading debris during construction of muck disposal road
Object thumbnail
14. Invert concrete pouring forms inside diversion tunnel
Object thumbnail
15. Gantry crane inside diversion tunnel no. 3
Object thumbnail
16. Side-wall jumbo inside diversion tunnel
Object thumbnail
17. Construction of steel forms for the lining of the diversion tunnels
Object thumbnail
18. Steel form for diversion tunnel lining being hoisted into Black Canyon
Object thumbnail
19. Bucket skips being filled with "muck" from the deep inner gorge of Black Canyon.
Object thumbnail
20. Workers laying railroad track near Boulder Canyon
Object thumbnail
21. Section of a concrete-pouring jumbo standing outside of a diversion tunnel
Object thumbnail
22. Cut-off trench at upstream side of Hoover Dam.
Object thumbnail
23. Nevada spillway during construction of Hoover Dam
Object thumbnail
24. Men working on Hoover Dam.
Object thumbnail
25. Men operating heavy equipment at Hoover Dam site.
Object thumbnail
26. Floor of Black Canyon
Object thumbnail
27. Black Canyon
Object thumbnail
28. Himix Concrete Plant at Hoover Dam site
Object thumbnail
29. Close-up of Hoover Dam concrete pouring construction taken from the Arizona side, looking downstream
Object thumbnail
30. Excavation for downstream plug, Diversion Tunnel No. 2.
Object thumbnail
31. View of two hundred ton two-way trailer, with test load
Object thumbnail
32. Construction on Hoover Dam, looking downstream on the Colorado River
Object thumbnail
33. View looking into power house block A-5.
Object thumbnail
34. Excavation for bridge abutment in Arizona spillway.
Object thumbnail
35. Looking downstream over the top of Hoover Dam
Object thumbnail
36. Interior of penstock tunnel -- Hoover Dam construction site
Object thumbnail
37. Constructing highway to dam site
Object thumbnail
38. Producing electricity at the construction site
Object thumbnail
39. Building Black Canyon Highway to Hoover Dam site
Object thumbnail
40. Construction workers at Hoover Dam.
Object thumbnail
41. Power house under construction - Hoover Dam site
Object thumbnail
42. Section of penstock pipe being lifted by cable
Object thumbnail
43. Construction on the no. 4 penstock raise
Object thumbnail
44. Construction on the four intake towers in Hoover Dam
Object thumbnail
45. Looking downstream on the Hoover Dam construction site
Object thumbnail
46. Top of Hoover Dam, during construction
Object thumbnail
47. Top of Hoover Dam, during construction
Object thumbnail
48. View of Arizona spillway during construction
Object thumbnail
49. Switchyard control circuit tunnel under construction -- Hoover Dam site
Object thumbnail
50. View of no. 1 plug showing the arch and raise
 

Subscribe to this Search