
51. Excavation for downstream plug, Diversion Tunnel No. 3.
|

52. Construction on Hoover Dam, looking downstream on the Colorado River
|

53. View looking into power house block A-5.
|

54. Closeup of cooling pipe layout in panel H-3.
|

55. Excavation for bridge abutment in Arizona spillway.
|

56. Looking downstream over the top of Hoover Dam
|

57. Interior of penstock tunnel -- Hoover Dam construction site
|

58. Unloading huge pipes -- Hoover Dam site
|

59. Constructing highway to dam site
|

60. Producing electricity at the construction site
|

61. Building Black Canyon Highway to Hoover Dam site
|

62. Construction workers at Hoover Dam.
|

63. Construction at Hoover Dam
|

64. Workers on the Colorado River
|

65. Nevada power house at Hoover Dam construction site
|

66. Downsteam view of Hoover Dam, showing power house construction
|

67. Power house under construction - Hoover Dam site
|

68. Interior view of a power house -- Hoover Dam construction site
|

69. Power house under construction at Hoover Dam site
|

70. Section of penstock pipe being lifted by cable
|

71. Commemoration of the pouring of the second millionth cubic yard of concrete in Hoover Dam
|

72. Construction on the no. 4 penstock raise
|

73. Construction on the no. 4 penstock raise
|

74. Construction on the four intake towers in Hoover Dam
|

75. Construction on the Nevada and Arizona power houses in the downstream cofferdam below Hoover Dam
|

76. Close-up of the Nevada powerhouse, showing the draft tubes.
|

77. Construction in the no. 4 penstock raise
|

78. Construction in the no. 1 penstock raise
|

79. Close-up of formwork in the Arizona power house
|

80. Construction on the Arizona power house
|

81. Looking downstream on the Hoover Dam construction site
|

82. Top of Hoover Dam, during construction
|

83. Top of Hoover Dam, during construction
|

84. View of bridge across Hoover Dam during construction
|

85. View of Arizona spillway during construction
|

86. Final pour in the slot, Hoover Dam
|

87. Building of intake tower, Hoover Dam site
|

88. Switchyard control circuit tunnel under construction -- Hoover Dam site
|

89. Hoover Dam construction, looking down on top
|

90. Intake towers during construction of Hoover Dam
|

91. Construction at Hoover Dam, inside a tunnel
|

92. View of no. 1 plug showing the arch and raise
|

93. Nevada valve house roof, looking upstream.
|

94. Switchyard control house, yard and present substation -- Hoover Dam site
|

95. View inside a tunnel at Hoover Dam site
|

96. Looking upstream at Hoover Dam during construction
|

97. Top of Hoover Dam during construction
|

98. Interior of Hoover Dam diversion tunnel during construction
|

99. View of switchyard at Hoover Dam site
|

100. View of construction on roads around the Arizona spillway
|