
101. Aerial view of Hoover Dam
|

102. Aerial view of Hoover Dam and the surrounding area
|

103. Construction of Hoover Dam
|

104. Downsteam face of Hoover Dam
|

105. Concrete pouring forms and construction on the intake towers at Hoover Dam
|

106. Water from the Colorado River
|

107. Start of construction of an intake tower
|

108. Aerial view of Hoover Dam from Lookout Point on the Nevada side
|

109. Hoover Dam under construction
|

110. Spillway on Arizona side of Hoover Dam
|

111. Blasting in the walls of Black Canyon for intake tower construction
|

112. Hoover Dam cooling tower and refrigeration plant during construction
|

113. Hoover Dam construction -- cooling tower and refrigeration plant
|

114. View of a power house at the Hoover Dam construction site
|

115. Downsteam view of Hoover Dam, showing power house construction
|

116. Aerial view of the Hoover Dam construction site looking upstream on the Colorado River
|

117. Aerial view of the Hoover Dam construction site looking downstream from the Arizona side
|

118. Close-up of no. 3 Arizona intake tower, showing the cylinder gates being placed.
|

119. Commemoration of the pouring of the second millionth cubic yard of concrete in Hoover Dam
|

120. Aerial view of construction on the top of Hoover Dam
|

121. Aerial view of the Hoover Dam construction site viewed from downstream on the Colorado River
|

122. Construction on the Nevada and Arizona power houses in the downstream cofferdam below Hoover Dam
|

123. Aerial view of the Hoover Dam construction site looking upstream on the Colorado River
|

124. Looking upstream toward Hoover Dam, during construction
|

125. Night photo of Hoover Dam, during construction
|

126. Upstream face of Hoover Dam, during construction
|

127. View of Hoover Dam during construction
|

128. Final pour in the slot, Hoover Dam
|

129. Building of intake tower, Hoover Dam site
|

130. Hoover Dam, looking downstream
|

131. Hoover Dam construction, looking down on top
|

132. Looking downstream into the Nevada spillway.
|

133. Hoover Dam, looking upstream from Lookout Point
|

134. Third millionth cubic yard of concrete being lowered to Boulder Dam
|

135. Top of Hoover Dam during construction
|

136. Hoover Dam during construction
|

137. Spillway and Hoover Dam during construction
|

138. Looking across the top of Hoover Dam during construction
|

139. Hoover Dam construction -- spillway
|

140. Construction on the Nevada spillway
|

141. Night construction -- intake tower at Hoover Dam
|

142. Hoover Dam -- at night
|

143. View of the Hoover Dam construction site looking downstream on the Colorado River
|

144. Construction on the roadway on top of Hoover Dam
|

145. Aerial view of Hoover Dam, looking downstream from the Arizona side of Black Canyon
|

146. Aerial view of Hoover Dam, looking upstream on the Colorado River
|

147. Blueprint layout of Hoover Dam.
|

148. Hoover Dam -- downstream face
|

149. Hoover Dam -- downstream face
|

150. Hoover Dam -- upstream face
|